Capital Project Information
-
2021 Slurry Seal - Duthie Boulevard and Marine View Drive (JPG)
Image shows contractors beginning the application of slurry seal at the intersection of Duthie Boulevard and Marine Drive as part of the 2021 Street Preservation project.
-
2021 Slurry Seal - Foothill Drive (JPG)
Image shows traffic cones at Lake View Drive and Foothill Drive intersection where slurry seal was completed in the oncoming lane of Foothill Drive as part of the 2021 Street Preservation project.
-
2021 Slurry Seal - Ripon Avenue (JPG)
Image shows contractors beginning the application of slurry seal at the 2100 block of Ripon Avenue as part of the 2021 Street Preservation project.
-
2021 Slurry Seal - Quail Run Drive (JPG)
Image shows traffic cones and a road closed sign at the entrance to Quail Run Drive after the application of slurry seal was completed by contractors as part of the 2021 Street Preservation project.
Street Preservation is an annual project which consists of making repairs to City streets on a rotating basis and involves the removal and replacement of deteriorated pavement areas, patching and overlay/chip seal, and other related rehabilitation work. This initiative is typically split into two separate projects - Slurry Seal and Seal & Fog Coat.